Construction Updates

  • AUGUST 3, 2023: FINALIZING BUILDING DESIGN DOCUMENT

    Pre-construction activities continue to progress nicely. Ralph Appelbaum Associates (exhibit designer) is at 100% concept completion. CJMW (architect) has finalized building design documents and is transitioning to construction level detail. SAMET (general contractor) is moving forward on value enhancements (optimizing construction materials and building design) and identifying long lead items to ensure we remain on…

  • APRIL 6, 2023: LONG LIVE THE LEGENDS

    Meeting in Jacksonville Our world class Construction Team was in Jacksonville to meet with us on 6 April 2023.  While we meet with all of them remotely and often, it is always inspiring when they converge on our site.  Photos show our team spending the day visiting the site, discussing the 50% exhibit concepts, going…

  • March 28, 2023: Concept Design Phase Begins

    With the team to build the Museum in place, we are moving out on the “Concept Design” phase with Ralph Appelbaum Associates (https://raai.com/), Exhibit Designer). It is fascinating to work with this team of experts as they develop an inspiring story that will be physically represented in the Museum. Also, CJMW Architecture (https://www.cjmw.com) are adjusting…

End of content

End of content